The Hourly Time Spent Report lists how much time each member has spent on training, broken down by hour. This report can be filtered by specific time periods, individual members, teams or the entire organization.
The Hourly Time Spent Report provides documentation of employee training hours throughout each working day. It serves as a reliable record of time spent on training activities. See below for column details:
Column | Description | Sample Value |
Member ID | A unique identifier of the member who started the content. | 631068252ef4 |
Member Email | The email address of the member who started the content. | jb@test.com |
Member First Name | The first name of the member who started the content. | Joe |
Member Last Name | The last name of the member who started the content. | Blogs |
Member Job Role | If the member is assigned a job role, this is the title of the job role. Otherwise, this field is blank | Azure Architect |
Training Start Date Time Range |
The start date time of the training hour period.
|
09-27-2023 12:00 |
Training End Datetime Range |
The end date time of the training hour period.
|
09-27-2023 12:59 |
Training Time Spent |
The total training time spent within the hour of the Training.
Note: in general this should not exceed 00:59:59. This is a possibility if the user opens multiple tabs and starts training on different resources in parallel. |
00:12:10 |
The Hourly Time Spent report is in the Platform Usage section on the Reports page. See the Reports article for step-by-step instructions to access and run this report.
Comments
0 comments
Please sign in to leave a comment.